Day-by-Day

Agenda

Programme

Explore Our Agenda

Case Study
08:40AM — 09:05AM

Successful disposal of maritime UXOs in situ without the destruction of the environment

  • Introduction to Low Order Deflagration (LOD)
  • Advantages of LOD over High Order and the significant proven reduction of environmental impact
  • Case Study – UK East Coast wind farm UXO disposal
  • Reactive tasking post construction during O&M
Speaker
Kim Godfrey
Kim Godfrey

EOD Business Delivery Manager, Helix Robotic Solutions Ltd

Case Study
09:05AM — 09:30AM

UXO Risk Management and Cable Installation

  • What are the risks from UXO to cable projects and how to assess them
  • Determining the risk horizon in relation to cable burial and finding the correct tools to mitigate the risk.
  • The effects of site conditions on how UXO can be mitigated and how long for
  • Effective design strategy and management is key to safe and efficient UXO mitigation implementation, to ensure cable installation projects can be completed safely and without unnecessary delay or costs.
Speaker
Victoria Phillips
Victoria Phillips

Technical Director, Tetra Tech

Case Study
09:30AM — 09:55AM

The Future North Sea Energy Grid – Outlook and Advanced Monitoring Strategies

  • Outlook towards 2050 with installed capacity of offshore wind, interconnectors and offshore hubs
  • Insights into integrated perspective and (international) interaction power grid with hydrogen grid (offshore hydrogen  and grid dynamics)
  • Deep dive into new monitoring technologies for subsea cables and it’s innovative applications for the sector
Speaker
Dr. J.M. (Joris) Koornneef
Dr. J.M. (Joris) Koornneef

Sr Consultant System Integration & Storage, TNO

Case Study
09:55AM — 10:20AM

From Fail and Fix to Predict and Prevent – The Benefits of Wirescan Digital from the Stakeholder’s Point of View

  • Manufacturers, full reference database from FAT
  • Installers, LIRA based cable health insight during installation and for future reference
  • Operators, cable health on portfolio level to prioritize and optimise cable O&M
  • Insurers, risk reduction and mitigation based on actual cable health
Speaker
Morten Huseby
Morten Huseby

CEO, Wirescan

Networking Break
10:20AM — 10:50AM

Morning Coffee and Networking

.

Case Study
10:50AM — 11:15AM

Care to Prepare

  • Key elements of “care to prepare”
  • Monitoring and surveys to prevent or act in case of cable risk/damage situation
  • New spare parts strategies to reduce cost, waste, and risk
  • Enable multiple data sources to Make Sense
Speaker
Andreas Hallengren
Andreas Hallengren

Business Development Manager - Offshore, NKT Service and Installation

Case Study
11:15AM — 11:40AM

New Methods for Improving Cable Lifetime

  • How to deal with fatigue of the CPS systems. Investigation of the dynamic loading and response of CPS systems and potential stabilisation methods.
  • Cables in morphodynamic environments. New methods for assessing seabed dynamics and mobility.
  • The cable as a sensor. New ideas on fibre optic- based cable lifetime monitoring
Speakers
Niek Bruinsma
Niek Bruinsma

Researcher Offshore Engineering, Deltares

Tom Roetert
Tom Roetert

Senior advisor & Researcher Offshore Engineering and Morphodynamics, Deltares

Case Study
11:40AM — 12:05PM

Fibre Sensing – No cable should go without!

  • How fibre sensing can prevent cable damage not just detect it.
  • How technology has improved to provide sensing over 1000s of km.
  • How to retrofit fibre sensing to existing cables that don’t have fibre.
  • Cost reduction using multiple fibres from one device
Speaker
Dan Danskin
Dan Danskin

Commercial Manager – DAS, Alcatel Submarine Networks

Case Study
12:05PM — 12:30PM

Is Distributed Fibre Optic Sensing Really Improving Reliability?

  • DFOS application to asset management and physical principles
  • Evidences from the field
Speaker
Etienne Rochat
Etienne Rochat

CTO, EOSS

Case Study
12:30PM — 12:55PM

AI in Marine Surveying: Where it Delivers the Greatest Impact.

  • AI superpowers, requirements and flaws.
  • Using AI for survey planning – AI reduces operational costs by optimizing vessel routes, minimizing fuel consumption, and cutting survey time.
  • Data processing & feature detection – Automating data analysis lowers labour costs, accelerates decision-making, and reduces human error in anomaly detection and seabed classification.
  • Environmental Monitoring & Risk Assessment – AI enhances predictive modelling for ocean conditions, biodiversity tracking, and asset integrity
Speaker
Nastasya Savina
Nastasya Savina

Chief Executive Officer, Seabed.AI

Lunch Time
12:55PM — 01:55PM

Lunch Break

.

Networking Break
01:55PM — 02:05PM

One-to-one Meetings and Networking Break

.

Case Study
02:05PM — 02:30PM

Cable Detection Innovation: Drone-Based Tracking System for Nearshore Cable Surveys

New drone-based cable tracking system successfully tested for nearshore wind farm cable surveys. Uses Seekable technology with flux gate magnetometers mounted on a drone to detect buried cables up to 4-8m deep.

Enables safer surveys in hazardous surf zones and rapid fault detection. Field tests in France (October 2024) demonstrated system's effectiveness at various heights and tidal conditions.

Technology addresses safety concerns of vessel-based surveys while providing cost-effective monitoring solution.

Speaker
Martin Koelman
Martin Koelman

Co-founder, Seekable

Case Study
02:30PM — 02:55PM

Security of Investment Strategies for Stakeholders of Subsea Cable Infrastructures

  • The DTS - understanding the route matrix challenges (DTS - desk top study)
  • Introduction of advanced post installation risk mitigation disciplines
  • Use of rapid recall data management as a service - DMaaS with cloud based storage (NAS)
  • Outline Review of 4C Geoscience's application of these disciplines
Speaker
Michael J Brooks
Michael J Brooks

Senior Executive, TGS-4C Offshore

Case Study
02:55PM — 03:20PM

Offshore Cabling Losses - A Loss Adjusters’ Perspective

  • Offshore wind vs Interconnectors essential lessons learnt
  • What can go wrong? How can we mitigate claims
  • Loss statistics, frequency, outage times, costs of repair,
  • How does geography affect the claim? US, Europe, and Asia Pac
  • How can you reduce your insurance costs?
Speaker
Matthew Yau
Matthew Yau

Director, Lloyd Warwick International

Case Study
03:20PM — 03:45PM

Subsea Cable Defects & Claims

My presentation will explore the subject of cable defects as manifested by torsions etc., and why insurers distinguish these from verified physical damage.

  • Is the cable damaged, and not merely defective?
  • How does the claimant prove damage without destroying the cable in the process?
  • What types of cover are there for defects resulting in damage?
  • Is time an issue?
  • Is it a get-out clause for insurers?
Speaker
Andrew Norris
Andrew Norris

Director – Energy Transition, Sedgwick Global Specialty Energy

Networking Break
03:45PM — 04:15PM

One-to -One Meetings & Networking Break

.

Case Study
04:15PM — 04:40PM

Investigating Offshore Wind Cable Repair with Empirical Data

  • An empirical study of the export and inter-array cable repair scope for over 40 offshore wind farms based on vessel position data
  • Gain insight into durations for cable repairs and how the durations compare between wind farms
  • Reviewing frequency of cable repairs and marine spread utilized
  • Understand trends in cable failures across the offshore wind industry
Speaker
Lars-André Tobaben
Lars-André Tobaben

Project Manager, Sea Impact

Case Study
04:40PM — 05:05PM

What is Readiness - Cable Repair and Maintenance

.

Speaker
Dale McDonald
Dale McDonald

Operations Manager Subsea Cables, N-Sea Group

Panel Discussion
05:05PM — 05:45PM

Subsea Power Cable Repair & Insurance Claims

  • How are insurance claims managed and what lessons can be learned?
  • How does the insurance policy respond to advances in fault detection?
  • Lessons learnt from asset management and repairs
  • How effective is quality tracking and long-term monitoring across the life cycle of cables, and how could this be further improved to reduce failures?
  • Subsea cable health and monitoring: How can we prevent failures and reduce outage time, and extend the cable system lifespan?
Moderator
Michael J Brooks
Michael J Brooks

Senior Executive, TGS-4C Offshore

Panelists
Andrew Norris
Andrew Norris

Director – Energy Transition, Sedgwick Global Specialty Energy

Morten Huseby
Morten Huseby

CEO, Wirescan

Lars-André Tobaben
Lars-André Tobaben

Project Manager, Sea Impact

Andreas Hallengren
Andreas Hallengren

Business Development Manager - Offshore, NKT Service and Installation

Dale McDonald
Dale McDonald

Operations Manager Subsea Cables, N-Sea Group

Closing Remark
05:45PM — 05:55PM

Chairman’s Closing Remarks and End of Day One

.