Day-by-Day

Agenda

Programme

Explore Our Agenda

Case Study
08:40AM — 09:05AM

A New Era of Global Clean Energy

  • Multi-GW projects combining renewable technologies to create firm power for local demand or to transport to demand centres (global grid).
  • Xlinks’ role: Established to deliver large-scale renewable energy projects that provide cost effective solutions to today's energy sector challenges.
  • Multi-Nodal HVDC systems and the role they will play.
  • Known challenges facing mega projects that use HVDC, and what needs to be done to overcome them.
Speaker
George Arvanitakis
George Arvanitakis

Senior Project Manager Cables and Marine, Xlinks

Case Study
09:05AM — 09:30AM

Eastern Greenlink 3 Cable – A 2GW 525KV Submarine HVDC link between Scottland and England over 500kms in length.

Eastern Green Link 3 (EGL3) - A proposed 2GW, 525kV high-voltage direct current (HVDC) "superhighway" connecting Peterhead (Aberdeenshire) to Lincolnshire/Norfolk, UK. Developed by SSEN Transmission and National Grid Group. It aims to transport renewable energy from Scotland to English demand centers, bolstering security and reducing grid constraint costs. The project includes ~680km of subsea and underground cabling, with targeted completion by 2033/34

  • High‑level overview of the objectives, scope & programme
  • Delivery strategy and approach
  • Key challenges & Risks.
  • Stakeholder & interface‑management approach.
Speaker
Abhijeet Saikia
Abhijeet Saikia

Head of Delivery, National Grid

Case Study
09:30AM — 09:55AM

DAS In Practice: Subsea Cable Asset Management at the MeyGen Tidal Array

  • End-to-end learnings from MeyGen on subsea power cable stability, monitoring, and risk transfer in a high-energy tidal site over multi-year operations.
  • Review original design assumptions and asset management expectations at project inception.
  • Observed cable behaviour in operation and the mitigations applied leading to a self-insurance model for cable risks.
  • How distributed acoustic sensing (DAS) changed fault locating and ongoing monitoring.
  • The proposed monitoring and insurability framework for the next 20 machine array.
Speaker
Fraser Johnson
Fraser Johnson

Director of Operations & Assets, MeyGen

Case Study
09:55AM — 10:20AM

Tales from Travelling the Rocky Road: Experiences and Lessons Learnt in Engineering Cables on Rocks

During 2025 the new British Standard BS10009 was published giving guidance on methods to predict the behaviour of subsea cables on rocky seabeds.

Building on lab research and field back analysis of the MeyGen cables, the design methods in this standard have now been applied to multiple tidal stream energy projects, two offshore windfarms located on rocky seabeds, and multiple OWFs where cables / CPS cross rock armour used as scour protection… as well as a few O&G projects.

These projects have also made use of rock bags for secondary stabilisation and tested the application of DAS for measuring quantifiable cable responses.

These experiences and salient lessons learnt need to be shared with the industry to avoid the pitfalls and problems that lie hidden therein – “the rocky road to success is better than the smooth path to failure!”

  • BS10009 on bottom stability design of cables on rocky seabeds
  • DAShed against the rocks – back analysis of DAS field data
  • CPS design, abrasion and modelling
  • Photogrammetry for MG and meso-scale roughness
  • Cable movements
Speaker
Terry Griffiths
Terry Griffiths

Director, Aurora Offshore Engineering Pty Ltd

Case Study
10:20AM — 10:45AM

Insurance, Scour and Seabed Mobility – How do Underwriters Respond to Claims for Damage?

  • Historical overview – scour damage issues in the past
  • Is there insurance cover?
  • What does the future look like?
Speaker
Andrew Norris
Andrew Norris

Director – Energy Transition, Sedgwick Global Specialty Energy

Networking Break
10:45AM — 11:15AM

Morning Coffee and Networking

.

Case Study
11:15AM — 11:40AM

Subsea Cable Infrastructure. Risk Identification, Reduction and Mitigation

Michael Brooks / Senior Executive / RiskPanel Marine

Case Study
11:40AM — 12:05PM

Predictive Cable Rating in Practice: Unlocking Capacity while Managing Risk

  • Why predictive cable rating matters. Unlocking hidden network capacity is becoming essential as electrification grows and grid constraints tighten. Predictive cable rating enables operators to use existing assets more efficiently while maintaining safety and reliability.
  • Limitations of traditional conservative cable ratings. Static ratings are designed around worst‑case assumptions that often do not occur in real life. This leads to under‑utilization of cable capacity, unnecessary curtailments, and premature investments in reinforcement.
  • How predictive cable rating works in practice. Advanced thermal models combine real‑time operational data, environmental conditions, and short‑term forecasts to dynamically estimate safe allowable load. This allows operators to maximize cable utilization while maintaining clear visibility of thermal margins and risk.
Speaker
Thomas Pettersen
Thomas Pettersen

Head of Digital Solutions, Unitech Power Systems

Case Study
12:05PM — 12:30PM

Reserved for NEXANS

.

Case Study
12:30PM — 12:55PM

Subsea Cable Repairs and Maintenance; Theory Versus Practice

  • How to be prepared for a cable fault
  • How to cost effective repair a subsea power cable
  • Case Study on actual repairs and lessons learned.
Speaker
Jack Wattel
Jack Wattel

Director Subsea Cables, N-Sea Group

Lunch Time
12:55PM — 01:55PM

Lunch Break

.

Networking Break
01:55PM — 02:05PM

One-to-one Meetings and Networking Break

.

Case Study
02:05PM — 02:30PM

Cable Repair and Challenges

  • Role of the MWS
  • Cable Repair planning
  • Challenges of fast track projects
  • Case Study
Speaker
Mike McLachlan
Mike McLachlan

Renewables MWS Director, Europe and London, ABL Group

Case Study
02:30PM — 02:55PM

Combining Optical and Electrical Monitoring Methods to further Improving Asset Reliability

Optical method featuring DTS and DAS have proven useful over years for asset monitoring.

Electrical method like partial discharge are of importance for joints and termination.

When both are used on an asset, they provide meaningful information from installation to operation.

The presentation will focus on the technology and its deployment in the field.

Speaker
Etienne Rochat
Etienne Rochat

CTO, EOSS

Case Study
02:55PM — 03:20PM

Latest Advances in Cable Condition Monitoring

  • Move from fail and fix to predict and prevent
  • Trend cable condition for data driven maintenance
  • User cases on installation and operation monitoring
Speaker
Aziz Sulaiman Rahim
Aziz Sulaiman Rahim

CEO, Wirescan AS

Case Study
03:20PM — 03:45PM

Analysis and Mitigation of a Fibre Optic Cable and Multi-pipeline Bundle Failure During Installation

  • Bundle configuration & incident description
  • Detailed analysis of cable in as-found condition
  • Lessons learned
Speaker
Chas Spradbery
Chas Spradbery

Operations Director EAME, Peritus International

Networking Break
03:45PM — 04:15PM

One-to -One Meetings & Networking Break

.

Case Study
04:15PM — 04:40PM

Sensing Technologies and Artificial Intelligence for Subsea Power Cable Asset Management

  • Sensor technology, machine learning and AI capabilities
  • Applying data science techniques to problems encountered in cable monitoring and predictive maintenance
  • How can data sharing become an integral part of O&M and improve cable reliability?
  • Leveraging breakthrough Industrial Internet technologies and Big Data analytics for safer, more efficient subsea cable operations
Case Study
04:40PM — 05:05PM

Condition Evaluation and Lifetime Strategy of HV Cable Systems

The presentation will outline the key findings of CIGRE Technical Brochure 912, developed by Working Group B1.68, which establishes a modern framework for condition evaluation and lifetime strategy of high-voltage cable systems.

The talk will present the integrated Health, Criticality and Risk-Index methodology, highlight how diagnostic data and operational history can be combined to assess remaining life, and discuss how asset managers can use these tools to support informed maintenance, refurbishment and replacement decisions across AC and DC land and submarine cable networks.

Speaker
Stelios Christou
Stelios Christou

Asset Manager ‑ HV Infrastructures, HV Infrastructures James Fisher Renewables

Case Study
05:05PM — 05:30PM

Turning Multi-Epoch Seabed Data into Lifecycle Risk Intelligence for Subsea Power Cables

This presentation explores how integrating multi-epoch seabed survey data can provide a comprehensive understanding of seabed dynamics and their impact on subsea cable integrity.

It introduces a risk assessment framework that translates seabed movement, sediment transport, and environmental changes into actionable lifecycle intelligence, enabling informed decision-making.

By leveraging data-driven insights for predictive maintenance and lifecycle planning, supported by real-world case studies, the session demonstrates how multi-temporal seabed analysis can enhance reliability, reduce downtime, and mitigate risks for subsea power infrastructure.

  • Integrating Multi-Epoch Seabed Data
  • Risk Assessment Framework
  • Predictive Maintenance
  • Real world case-studies
Speaker
Dino Dragun
Dino Dragun

CEO, Hidrocibalae

Case Study
05:30PM — 05:55PM

Care to Prepare

.

Speaker
Fredric Holmgren
Fredric Holmgren

VP, Head of Offshore within Grid Solutions, NKT

Panel Discussion
05:55PM — 06:35PM

The Future of Subsea Cable Asset Management

  • How are digital innovation is reshaping asset management and maintenance?
  • Challenges to data driven operations and asset management, especially from an end users perspective
  • Challenges in cable asset management in mobile seabed areas
  • Common cable failure points, diagnosing issues and improving long-term reliability
  • How to prevent subsea cable damages, while minimizing downtime and costs
  • What are the trends & Innovations to improve subsea cable repair, monitoring and detection
  • Lessons from oil and gas sector towards improved cable asset management process

Moderator

Heather Spain */ HVDC Cables Engineer, Interconnection / EirGrid Group

Panelists

Jay Jayakumar / Asset Specialist / TenneT

Rene van Kessel / Consultant Submarine Cables / CableAbility

Vidar Bergli / VP Sales / Wirescan AS

Nastasya Savina / Chief Executive Officer / Seabed.AI

Dino Dragun / CEO / Hidrocibalae

Closing Remark
06:35PM — 06:45PM

Chairman’s Closing Remarks and End of Day One

.