Keynote
08:40AM — 09:30AM

Overview of the Global Market for Wind Energy– the results of the WindEnergy trend:index (16th)

 

  • Overall market sentiment in the wind energy sector on a global and regional scale
  • Impact of grid-bottlenecks on wind energy projects Technical developments, improvements, and their impact
Speaker
Dirk Briese
Dirk Briese

CEO, trend:research GmbH

Case Study
09:30AM — 09:55AM

Too Slow to Scale? Substation Bottlenecks in the Race to Offshore Wind Targets

  • Global offshore wind forecast and ambition for fixed and floating wind
  • Expected demand for offshore substations through 2040
  • Overview of main substation manufacturers, including market shares
  • Increasing lead times for both AC and DC substations
  • Industry readiness: Can we meet offshore wind targets amid lengthening substation lead times?
Speaker
Rameeza Duggal
Rameeza Duggal

Senior Analyst, 4C Offshore

Case Study
09:55AM — 10:20AM

Fabricators’ Perspective on the Future Needs for Offshore Grid Infrastructure

  • Lead item: HV-equipment (power transformers): 36 months
  • AC-substations: OTM types: basis for standardization?
  • HVDC: 2GW standard platform requires substantial yard investments
  • Meshed Grid as substitute for point-to-point grid connection
  • Energy Hub: islands or platforms?
  • “Airbus Industries” initiative for offshore substations?
Speaker
Eric Finé
Eric Finé

Business Development Manager, Smulders

Case Study
10:20AM — 10:45AM

Accelerating Floating Offshore Wind Deployment- Policy Enablers and Infrastructure Readiness

 

  • Strategic planning and coordination across seabed leasing, grid development, and port upgrades
  • Infrastructure bottlenecks: grid connectivity and port readiness for large-scale deployment
  • Financial de-risking mechanisms and investment frameworks to support early-stage projects
  • Recommendations for aligning policy with deployment timelines and Net Zero targets
Speaker
Inès Tunga
Inès Tunga

Practice Manager - Renewables, Energy Systems Catapult

Networking Break
10:45AM — 11:15AM

Morning Coffee and Networking

.

Case Study
11:15AM — 11:40AM

Insights from Common RTE-Statnett Project Looking at Technologies related to Offshore Grid Development at Deep Waters

.

Speakers
Christos Dikaiakos
Christos Dikaiakos

R&D Projects Coordinator, Statnett

Daniele Botrugno
Daniele Botrugno

Head of Division Offshore Substations Design and Asset Management, Réseau de Transport d'Électricité

Case Study
11:40AM — 12:05PM

The Integrated Mooring & Cable Design Conundrum for Floating Offshore Substations

  • Overview of typical cable design process
  • Influence of mooring system on cable design
  • Integrated system design case study
  • Challenges for dynamic export cables
Speaker
Owen Pocock
Owen Pocock

Technical Manager – Renewables, 2H Offshore

Case Study
12:05PM — 12:30PM

BW Ideol’s Floating Substation Concept: A Market-Ready Solution

  • A robust and proven design
  • Scalability for all sizes of WF
  • Compatibility with HVAC equipments
  • Construction and Integration easiness
Speaker
Etienne Chauvin
Etienne Chauvin

Proposal Manager, BW Ideol

Case Study
12:30PM — 12:55PM

How Can Class Contribute to Cost Savings for Floating Substations?

  • Standardization utilizing offshore/ maritime approaches
  • Industrialization - existing supply chains
  • Remove uncertainties related to design and fabrication
  • Integrity management
Speaker
Arild Rogne
Arild Rogne

Head of Section Floating Offshore Structures, DNV AS

Lunch Time
12:55PM — 01:55PM

Lunch Break

.

Case Study
01:55PM — 02:20PM

Basic Design of 2GW Floating Offshore Substations: Conclusion of the AFOSS-DC R&D Project

  • Semi-sub vs. TLP: which one is the best?
  • Feedback on TLP basin test campaign
  • Example of cable configurations
  • How to tackle vibration at component level: the example of vibration damping systems
Speaker
Jérémy Bioud
Jérémy Bioud

Project Manager – MRE Systems, France Energies Marines

Case Study
02:20PM — 02:45PM

Optimizing Offshore Substation Concepts for 1–2 GW Wind Farms

  • Comparative study of six offshore HV substation concepts (1, 1.4, 2 GW in both HVAC and HVDC).
  • Focus on platform characteristics: weight, space, manufacturability, commissioning.
  • Collaboration with two OEMs covering HVAC and HVDC equipment supply.
Speaker
Peter Sjögren
Peter Sjögren

Project Manager, Inocean AB

Case Study
02:45PM — 03:10PM

Transmission System Design, 1 GW and Beyond

  • HVAC vs HVDC
  • Optimum number of OSSs
  • Requirement of compensative platform
  • Site data limitation
  • Structural type to support OSS facility
  • CAPEX & OPEX
Speakers
Fernando Liman
Fernando Liman

OSS Structural Engineer (External), Outer Dowsing Offshore Wind

Marko Istenic
Marko Istenic

Transmission System Package Manager, Outer Dowsing Offshore Wind

Case Study
03:10PM — 03:35PM

Recent Advancements in HVAC Floating Substation Design

  • Proven and Certified Design for Offshore Reliability
  • Strategic Collaboration with Leading OEMs and Key Stakeholders
  • Design Performance Validated Through Comprehensive Tank Testing
  • Flexible Solutions Tailored to Diverse Project Requirements
Speaker
Marco Vergassola
Marco Vergassola

Offshore Engineer Senior, Sener

Case Study
03:25PM — 03:50PM

Unlocking Offshore Wind Potential with Subsea Substation

.

Speaker
Arill S. Hagland
Arill S. Hagland

Global Business Development Manager, OneSubsea Processing

Networking Break
03:50PM — 04:20PM

One-to -One Meetings & Networking Break

.

Case Study
04:20PM — 04:45PM

Transitional Water Depth Between Fixed and Floating OSS – When do we really need FOSS

  • Motivation: when to choose floating over fixed?
  • Design Study: Jacket vs Semi-submersible
  • Cost Study: Supply Vs. T&I, what tips the scales.
  • Cable considerations and feasibility
Speaker
Daniel Tornroos
Daniel Tornroos

Principal Naval Architect, Ramboll

Case Study
04:45PM — 05:10PM

Fatigue on Export Cables

  • Influence of hull form
  • Hang-off location
  • Cable configurations
  • The benefits of bend stiffeners
Speaker
Justin Jones
Justin Jones

Group Manager, Civil and Structural, Petrofac – Energy Transition Projects

Case Study
05:10PM — 05:35PM

Structural Health Monitoring of Offshore Structures in the Wind Industry

.

Speaker
Jens Krieger
Jens Krieger

Senior Expert SHM Offshore Wind, VCE Vienna Consulting Engineers ZT GmbH

Case Study
05:35PM — 06:00PM

Construction and Installation of Floating Substations

  • Fabrication yard for substructure and topsides
  • Ocean transport of the completed structure
  • Offshore installation of the floating substation
Speaker
Alan Crowle
Alan Crowle

Researcher, University of Exeter

Closing Remark
06:00PM — 06:10PM

Closing Remarks by the Chairman

.